000 02142nam a22002053a 4500
001 UPMIN-00006586037
003 UPMIN
005 20231012165849.0
008 231012b |||||||| |||| 00| 0 eng d
040 _cUPMin
090 0 _aLG993.5 2013 C54
_bE38
100 _aEstacio, Remle Anne M.
_eauthor
_923893
245 2 _aA case study documenting the various methods used by the local barangay unit of Matina Crossing in the post-crisis phase of the Davao City flash flood /
_cRemle Anne M. Estacio
300 _a92 leaves.
502 _aThesis, Undergraduate (BA Communication Arts) -- U. P. in Mindanao
520 3 _aPre-crisis phase of crisis management and crisis communication is the least studied phase of Coombs? 3-phase model. Moreover, Barangay Matina Crossing bore the worst effect of the June 28, 2011 flash flood considered as the worst disaster to hit the city in decades. The aftermath of the Davao City flash flood served as a challenge for the local barangay to effectively respond and develop strategies to improve the crisis management and communication process. The prevalence of flash flood incidents in the city and the nature of natural disasters gave importance to this study. The researcher documented the various post-crisis methods employed by the barangay as presented in the interview with Barangay Secretary Mr. Leonardo Villafuerte, Barangay Kagawad Joseph Encabo, and Disaster Operations team Chief Mr. Renante Luna. The methods documented were classified into short-term and long-term methods. These post-crisis methods were analyzed by looking into what have been done in the pre-crisis and crisis phase of the Davao City flash flood. To analyze the post-crisis methods, the researcher employed the concepts of Combs? 3-Phase Model, Diffusion of Innovation Theory, and Tisch Center Scholars? Crisis Management Cycle. This study revealed the organizational learning of the barangay from the flash flood. Also, the importance of the stakeholders was strengthened by the results of the research.
650 1 7 _aCommunication Arts
_xSpeech Communication
_923165
905 _aBACA - SPCM
942 _2lcc
_cTHESIS
999 _c2808
_d2808