Discrete adaptation of the artificial bee colony algorithm applied to time-cost trade-off problem / Francis Marie D. Morales
Material type:![Text](/opac-tmpl/lib/famfamfam/BK.png)
Cover image | Item type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|
|
![]() |
University Library General Reference | Reference/Room-Use Only | LG993.5 2010 C6 M67 (Browse shelf(Opens below)) | Not For Loan | 3UPML00012598 | |
|
![]() |
University Library Archives and Records | Preservation Copy | LG993.5 2010 C6 M67 (Browse shelf(Opens below)) | Not For Loan | 3UPML00034073 |
Browsing College of Science and Mathematics shelves, Shelving location: General Reference Close shelf browser (Hides shelf browser)
Thesis (BS Computer Science) -- University of the Philippines Mindanao, 2010
Time cost optimization (TCO) may be define as a process to identify suitable construction activities for speeding up, and for deciding "by how much" so as to attain the best possible savings in both time and cost. It is generally realized that when project duration is compressed, the project will call for an increase in labor and more productive equipment, and require more demanding procurement and construction management, resulting to increase of cost. On the other hand, using fewer resources will result in extended duration of activities. In this papare, we have proposed a discrete adaptation of the artificial bee colony (ABC) algorithm for the time-cost trade-off problem. The ABC algorithm is a new metaheuristic approach inspired by intelligent foraging behavior of honeybee swarm.We have compared the performance of our discretely adapted ABC against three algorithms: Particle Swarm Optimization (PSO), Ant Colony Optimization (ACO) and genetic algorithm (GA). Computational results demonstrate the superiority of the discrete ABC over the three algorithms. It obtained better qualtiy solutions in shorter time.
There are no comments on this title.